How the maths works
Volume is length × width × thickness. Thickness is in millimetres, so divide by 1,000 — a 10m × 3m driveway at 100mm is 10 × 3 × 0.1 = 3 m³.
Work out how much concrete your driveway, shed slab or patio needs in cubic metres, plus an indicative supply-and-lay cost at typical Melbourne rates.
Enter the area you want concreted.
$85–$120 per m²
Standard broom or trowel finish — most driveways and paths.
10% is a sensible default for uneven sub-grade and spillage.
Concrete required
3.30 m³
Includes 10% waste — 3.00 m³ before allowance.
Indicative supplied & laid
$2,550 – $3,600
Plain / grey concrete at $85–$120/m². Excavation, removal of existing concrete, difficult access, pumping and engineered footings are extra.
Estimates only, based on typical Melbourne rates. Your final price depends on site conditions and prep.
Volume is length × width × thickness. Thickness is in millimetres, so divide by 1,000 — a 10m × 3m driveway at 100mm is 10 × 3 × 0.1 = 3 m³.
Sub-grade is rarely perfectly level, and running short mid-pour costs far more to fix than a small over-order. A 5–10% allowance is standard practice.
Per-m² rates cover concrete, mesh, labour, formwork and finishing. Excavation, old concrete removal, pumping and engineered footings sit on top.
This calculator gives you a ballpark. All Rounder Concreting provides free, no-obligation on-site quotes right across Melbourne — call Gary on 0434 081 032.
Estimate
3.30 m³$2,550–$3,600